BD INTIMA-II¿ CLOSED IV CATHETER SYSTEM
Report
- Report Number
- 3006948883-2019-00365
- Event Type
- Malfunction
- Date Received
- May 10, 2019
- Date of Event
- December 26, 2018
- Report Date
- May 29, 2019
- Manufacturer
- BD (SUZHOU)
- Product Code
- FOZ
- PMA / PMN Number
- N/A
- Adverse Event
- Yes
- Product Problem
- Yes
- Report Source
- Manufacturer report
- Reporter Location
- CH
- Reporter Occupation
- NURSE
Narratives
INVESTIGATION: A DEVICE HISTORY REVIEW WAS CONDUCTED FOR LOT NUMBER 8043033. OUR RECORDS SHOW THAT THIS IS THE ONLY INSTANCE OF THIS ISSUE OCCURRING IN THIS PRODUCTION BATCH. ACCORDING TO THE SAMPLING PLAN APPLIED FOR PRODUCT PERFORMANCE, THIS LOT WAS ACCEPTED AND RELEASED WITHOUT DEFECTS BEING NOTED DURING THE FINAL ASSEMBLY OR VISUAL INSPECTIONS. UNFORTUNATELY A SAMPLE COULD NOT BE OBTAINED FOR EVALUATION AND TESTING. WITHOUT THE ABILITY TO INVESTIGATE THE AFFECTED UNIT OUR QUALITY ENGINEERS WERE UNABLE TO DETERMINE THE ROOT CAUSE FOR THIS COMPLAINT.
IT WAS REPORTED THAT BEFORE USE OF THE BD INTIMA-II¿ CLOSED IV CATHETER SYSTEM THE PACKAGE WAS DAMAGED. FOREIGN COMPLAINT THE FOLLOWING INFORMATION WAS PROVIDED BY THE INITIAL REPORTER, TRANSLATED FROM CHINESE TO ENGLISH: IT WAS FOUND PACKAGE DAMAGED DURING PREPARATION.
A DEVICE EVALUATION IS ANTICIPATED, BUT HAS NOT YET BEGUN. UPON COMPLETION OF THE INVESTIGATION, A SUPPLEMENTAL REPORT WILL BE FILED.
IT WAS REPORTED THAT BEFORE USE OF THE BD INTIMA-II¿ CLOSED IV CATHETER SYSTEM THE PACKAGE WAS DAMAGED. FOREIGN COMPLAINT THE FOLLOWING INFORMATION WAS PROVIDED BY THE INITIAL REPORTER, TRANSLATED FROM (B)(6) TO ENGLISH: IT WAS FOUND PACKAGE DAMAGED DURING PREPARATION.
Devices
| Seq | Brand | Generic | Product Code | Manufacturer | Model | Lot | UDI-DI |
|---|---|---|---|---|---|---|---|
| 391779 | BD INTIMA-II¿ CLOSED IV CATHETER SYSTEM | INTRAVASCULAR CATHETER | FOZ | BD (SUZHOU) | 8043033 |
Patients
| Seq | Age | Sex | Outcome | Treatment |
|---|---|---|---|---|
| 1 | Other |