VENTED AUTOFEED CHAMBER
Report
- Report Number
- 9611451-2013-00441
- Event Type
- Malfunction
- Date Received
- June 11, 2013
- Date of Event
- April 30, 2013
- Report Date
- May 7, 2013
- Manufacturer
- FISHER & PAYKEL HEALTHCARE LTD
- Product Code
- BTT
- PMA / PMN Number
- K934140
- Product Problem
- Yes
- Report Source
- Manufacturer report
- Reporter Location
- JA
- Reporter Occupation
- OTHER
Narratives
(B)(4). DEVICE MANUFACTURER DATE: DEVICE 1 - LOT 120627 - 06/27/2012; DEVICE 2 - LOT 100312 - 03/12/2010. METHOD: THE TWO COMPLAINT CHAMBERS WERE RETURNED TO FISHER & PAYKEL HEALTHCARE (B)(4) FOR EVALUATION. THE COMPLAINT CHAMBERS WERE VISUALLY INSPECTED AND CONNECTED TO A WATERBAG TO TEST FOR LEAKS. RESULTS: DEVICE 1, MR290V CHAMBER LOT 120627: THE VISUAL INSPECTION IDENTIFIED THAT THE FEEDSET TUBE OF THE COMPLAINT CHAMBER TO BE PULLED SLIGHTLY OUT OF THE WATERBAG SPIKE. SMALL DROPS OF WATER BEGAN TO BUILD AT THE CONNECTION BETWEEN THE FEEDSET TUBE AND THE WATERBAG SPIKE WHEN THE COMPLAINT CHAMBER WAS CONNECTED TO A WATER BAG. A SUFFICIENT AMOUNT OF GLUE WAS PRESENT AROUND THE SPIKE TUBING CONNECTION. DEVICE 2, MR290V CHAMBER LOT 100312: NO VISIBLE DAMAGE WAS OBSERVED ON THE COMPLAINT CHAMBER WITH LOT 100312. WHEN THE WATER FEEDSET TUBE OF THE COMPLAINT CHAMBER WAS PLACED UNDER TENSION SMALL DROPS OF WATER BEGAN TO BUILD UP AT THE CONNECTION BETWEEN THE FEEDSET TUBE AND WATERBAG SPIKE. A SUFFICIENT AMOUNT OF GLUE WAS PRESENT AROUND THE SPIKE TUBING CONNECTION. A LOT CHECK REVEALED NO OTHER SIMILAR COMPLAINTS OF THIS NATURE FOR LOT 120627 AND LOT 100312. CONCLUSION: IT IS MOST LIKELY THAT THE FEEDSET WAS SET UP UNDER TENSION, CAUSING THE OBSERVED WATER LEAKAGE. WE HAVE CONDUCTED EXTENSIVE TESTING OF OUR MR290 CHAMBER, WITH PARTICULAR EMPHASIS ON FEEDSET BREAKS. THE SPECIFICATION FOR THE CHAMBER REQUIRES THAT THE FEEDSET TUBE SHOULD HAVE A BREAKING STRAIN OF 30 NEWTONS. DURING PRODUCTION, PULL TESTING OF THE FEEDSET STRENGTH AT BOTH SPIKE AND DOME END IS PERFORMED EVERY HOUR ON MR290 CHAMBERS FROM EACH PRODUCTION LINE. TESTING INVOLVING SIMULATED AGEING OF THE FEEDSET TO CHECK WHETHER THE STRENGTH OF THE GLUE JOINT DECREASES OVER TIME REVEALED THAT THE FEEDSETS ON AGED CHAMBERS WERE ONLY BREAKING AT 50 TO 55N OR MORE, PROVING THAT SHELF LIFE HAS NO NEGATIVE IMPACT ON THE ULTIMATE TENSILE STRENGTH OF THE GLUE JOINT. ALL CHAMBERS ARE PRESSURE TESTED BEFORE THEY LEAVE THE PRODUCTION LINE AND ANY HOLES OR LEAKS IN THE FEEDSET ARE IDENTIFIED DURING THIS PROCESS. THIS SUGGESTS THAT THE DAMAGE TO THE FEEDSET TUBE OCCURRED AFTER RELEASE FOR DISTRIBUTION. THE USER INSTRUCTIONS WHICH ACCOMPANY THE MR290 CHAMBER STATE THE FOLLOWING: "SET APPROPRIATE VENTILATOR ALARMS." "PERFORM A PRESSURE AND LEAK TEST ON THE BREATHING SYSTEM AND CHECK FOR OCCLUSIONS BEFORE CONNECTING TO A PATIENT."
A HOSPITAL IN (B)(6) REPORTED VIA OUR DISTRIBUTOR THAT WATER LEAKED FROM THE CONNECTION BETWEEN THE WATER FEEDSET TUBE AND BAG SPIKE OF TWO MR290 VENTED AUTOFEED HUMIDIFICATION CHAMBERS DURING SET UP. THIS WAS REPORTED PRIOR TO PATIENT USE.
Devices
| Seq | Brand | Generic | Product Code | Manufacturer | Model | Lot | UDI-DI |
|---|---|---|---|---|---|---|---|
| 264036 | VENTED AUTOFEED CHAMBER | BTT | BTT | FISHER & PAYKEL HEALTHCARE LTD | MR290V | 100312, 120627 |
Patients
| Seq | Age | Sex | Outcome | Treatment |
|---|---|---|---|---|
| 1 | RT200 ADULT DUAL-HEATED BREATHING CIRCUIT |