SYNCARDIA TEMPORARY TOTAL ARTIFICIAL HEART
Report
- Report Number
- 3003761017-2012-00048
- Event Type
- Other
- Date Received
- September 4, 2012
- Date of Event
- August 8, 2012
- Report Date
- August 30, 2012
- Manufacturer
- SYNCARDIA SYSTEMS, INC.
- Product Code
- LOZ
- PMA / PMN Number
- P030011
- Report Source
- Manufacturer report
- Reporter Location
- FR
- Reporter Occupation
- PHYSICIAN
Narratives
SYNCARDIA HAS INITIATED A CAPA (CORRECTIVE OR PREVENTIVE ACTION) TO ADDRESS THE CANNULA TEAR ISSUE. THE CAPA WILL DOCUMENT THE INVESTIGATION INCLUDING, BUT NOT LIMITED TO, POTENTIAL ROOT CAUSE AND CORRECTIVE ACTIONS ASSOCIATED WITH ALL CANNULA TEAR EVENTS. FROM 2004 TO AUGUST 29, 2012 THERE HAVE BEEN A TOTAL OF (B)(4) TAH-T IMPLANTS WORLDWIDE AND A TOTAL OF (B)(4) TAH-T PTS WHO EXPERIENCED A CANNULA BREACH, FOR A RATE OF ABOUT (B)(4) PERCENT. NONE OF THE PTS EXPERIENCED ANY INJURIES AS A RESULT OF THE CANNULA TEARS. SYNCARDIA HAS REQUESTED THAT THE TAH-T AND CANNULA BE RETURNED TO SYNCARDIA AFTER THE PT IS TRANSPLANTED. THE RESULTS WILL BE PROVIDED IN A SUPPLEMENTAL MDR.
PT WAS IMPLANTED WITH A SYNCARDIA TEMPORARY TOTAL ARTIFICIAL HEART (TAH-T) AT CENTER HOSPITALIER (B)(6), ON (B)(6) 2011. HE WAS SWITCHED TO A PORTABLE SYNCARDIA FREEDOM DRIVER ON (B)(6) 2011 AND HAS BEEN LIVING AT HOME FOR THE LAST TEN MONTHS. THE PT LIVES A VERY ACTIVE LIFE AND DOES A LOT OF DRIVING, EXERCISING, ETC. ON (B)(6) 2012, SYNCARDIA WAS NOTIFIED THAT ON (B)(6) 2012, THE PT REPORTED THAT HIS LEFT CANNULA HAD DEVELOPED A CRACK IN THE EXTERNAL SHEATH. THE PT HAD BEEN IMPLANTED WITH THE TAH-T FOR 367 DAYS WHEN THE CRACK IN THE CANNULA WAS OBSERVED. THE CRACK WAS LIMITED TO THE EXTERNAL SHEATH. THE INTERNAL TUBE WAS INTACT AND THERE WAS NO LEAK OF AIR FROM THE CANNULA. THE CRACK TO THE EXTERNAL SHEATH OF THE CANNULA DID NOT AFFECT THE FUNCTIONALITY OF THE TAH-T AND HAD NO IMPACT ON THE PT. DR. (B)(6) OF (B)(6) INSPECTED THE CANNULA THE NEXT DAY WHEN HE WENT TO THE PT'S HOME TO EXCHANGE HIS FREEDOM DRIVER FOR MAINTENANCE PURPOSES. DR. (B)(6) REPORTED THAT THE CRACK WAS ALMOST CIRCULAR, BETWEEN THE DRIVELINE CONNECTOR AND THE SPRING INSURING THE REINFORCEMENT OF THE CANNULA. DR. (B)(6) REPAIRED THE CANNULA BY WRAPPING IT WITH ECC TUBING AND TAPE. THE RIGHT CANNULA WAS ALSO PROPHYLACTICALLY WRAPPED WITH ECC TUBING AND TAPE. THERE WAS NO ADVERSE IMPACT ON THE PT. THE PT IS STILL IMPLANTED WITH THE TAH-T AND IS DOING WELL. DR. (B)(6) ALSO REPORTED THAT THE CANNULA REPAIR WAS INSPECTED BY THE CLINICIANS AT CENTER HOSPITALIER (B)(6), AND THEY APPROVED OF THE REPAIR. THE REPAIR IS STABLE AND WILL BE REGULARLY INSPECTED AT PT (B)(4) FOLLOW-UP VISITS.
Devices
| Seq | Brand | Generic | Product Code | Manufacturer | Model | Lot | UDI-DI |
|---|---|---|---|---|---|---|---|
| 1 | SYNCARDIA TEMPORARY TOTAL ARTIFICIAL HEART | ARTIFICIAL HEART | LOZ | SYNCARDIA SYSTEMS, INC. | TAH-T | 069301 |
Patients
| Seq | Age | Sex | Outcome | Treatment |
|---|---|---|---|---|
| 1 | 36 YR | Required Intervention |