GLP TRACK END
Report
- Report Number
- 3023268435-2026-00004
- Event Type
- Malfunction
- Date Received
- April 1, 2026
- Date of Event
- March 23, 2026
- Report Date
- April 13, 2026
- Manufacturer
- ABBOTT AUTOMATION SOLUTIONS GMBH
- Product Code
- JQP
- UDI-DI
- 00380740196950
- Product Problem
- Yes
- Report Source
- Manufacturer report
- Reporter Location
- IT
- Reporter Occupation
- OTHER HEALTH CARE PROFESSIONAL
- Health Professional
- Yes
Narratives
THE FIELD SERVICE REPRESENTATIVE (FSR) IDENTIFIED THAT DURING INSTALLATION OF GLP TRACK, SERIAL (B)(6), THE ASSOCIATED 5V POWER SUPPLY HAD THE WRONG PHASE BLACK CABLE ATTACHED, CAUSING A SHORT WHERE SMOKE WAS VISIBLE FROM THE UNIT. NO INJURY WAS REPORTED, AND A REPLACEMENT POWER SUPPLY WAS ORDERED TO RESOLVE THE ISSUE. A REVIEW OF TRACKING AND TRENDING OF THE GLP TRACK END DID NOT FIND ANY OTHER COMPLAINTS RELATED TO THE CURRENT ISSUE AND NO TRENDS WERE IDENTIFIED. CURRENT LABELING PROVIDES FIELD SERVICE THE INSTRUCTIONS FOR CONFIGURING AND SETTING UP THE PODIS CONNECTION FOR THE GLP TRACK POWER SUPPLY. BASED ON THE INVESTIGATION THE GLP TRACK, SERIAL (B)(6) PERFORMED AS INTENDED, NO SYSTEMIC ISSUE OR DEFICIENCY OF THE GLP TRACK, SERIAL (B)(6) OR THE 5V POWER SUPPLY WAS IDENTIFIED. THIS REPORT IS BEING FILED ON THE GLP TRACK END, LIST NUMBER 06Q42-51, WHICH HAS A SAME/SIMILAR COMPONENT OF THE GLP IN/OUT MODULE (IOM), LIST 4Z96, 510K K213486.
AN EVALUATION IS IN PROCESS. A FOLLOW-UP REPORT WILL BE SUBMITTED WHEN THE EVALUATION IS COMPLETE. SECTION A PATIENT INFORMATION: REFER TO SECTION B5 FOR COMPLETE PATIENT INFORMATION.
DURING INSTALLATION OF THE GLP TRACKING END THE TECHNICAL SERVICE SPECIALIST (TSS) OBSERVED SMOKE COMING FROM THE 5V POWER SUPPLY. THIS OCCURRED DURING THE CONNECTING PHASE OF INSTALLING THE POWER SUPPLY AND THE INCORRECT BLACK CABLE WAS MOVED WHICH CAUSED A SHORT CIRCUIT. WHITE SMOKE WAS SEEN COMING OUT OF THE POWER SUPPLY. A NEW POWER SUPPLY WAS ORDERED AND INSTALLED. THERE WAS NO INJURY TO THE TSS OR CUSTOMER. NO IMPACT TO PATIENT MANAGEMENT WAS REPORTED. THERE WAS NO INJURY TO THE TSS, OR CUSTOMER REPORTED. NO IMPACT TO PATIENT MANAGEMENT WAS REPORTED.
DURING INSTALLATION OF THE GLP TRACKING END THE TECHNICAL SERVICE SPECIALIST (TSS) OBSERVED SMOKE COMING FROM THE 5V POWER SUPPLY. THIS OCCURRED DURING THE CONNECTING PHASE OF INSTALLING THE POWER SUPPLY AND THE INCORRECT BLACK CABLE WAS MOVED WHICH CAUSED A SHORT CIRCUIT. WHITE SMOKE WAS SEEN COMING OUT OF THE POWER SUPPLY. A NEW POWER SUPPLY WAS ORDERED AND INSTALLED. THERE WAS NO INJURY TO THE TSS OR CUSTOMER. NO IMPACT TO PATIENT MANAGEMENT WAS REPORTED. THERE WAS NO INJURY TO THE TSS, OR CUSTOMER REPORTED. NO IMPACT TO PATIENT MANAGEMENT WAS REPORTED.
Devices
| Seq | Brand | Generic | Product Code | Manufacturer | Model | Lot | UDI-DI |
|---|---|---|---|---|---|---|---|
| 814725 | GLP TRACK END | CALCULATOR/DATA PROCESSING MODULE, FOR CLINICAL USE | JQP | ABBOTT AUTOMATION SOLUTIONS GMBH | 00380740196950 |
Patients
| Seq | Age | Sex | Outcome | Treatment |
|---|---|---|---|---|
| 1 | NA | Unknown |