EUREKA COLLIMATOR
Report
- Report Number
- 1423380-2009-00031
- Event Type
- Malfunction
- Date Received
- January 22, 2010
- Date of Event
- December 29, 2009
- Report Date
- January 22, 2010
- Manufacturer
- MIDMARK CORPORATION
- Product Code
- IZW
- PMA / PMN Number
- K810598
- Product Problem
- Yes
- Report Source
- Manufacturer report
- Reporter Location
- MI, US
- Reporter Occupation
- OTHER
Narratives
AN INVESTIGATION OF THE UNIT REVEALED THAT THE TRIAC HAD FAILED. THE CERAMIC INSULATOR, WHICH IS USED TO REMOVE THE HEAT FROM THE TRIAC AND ELECTRICALLY ISOLATE THE UNIT FROM GROUND, WAS BROKEN, ISOLATING THE TRIAC FROM THE CHASSIS. THIS CAUSED THE TRIAC TO OVERHEAT AND FAIL IN A SHORTED MODE. THE TRIAC WAS REPLACED AND THE UNIT OPERATED NORMALLY. IN ADDITION, A COLLIMATOR (B) (4) WAS TESTED TO SIMULATE THE FAILURE MODE. THE CUSTOMER COMPLAINT ALLEGING "FIRE" ASSOCIATED WITH A SHORTED OUT LAMP CIRCUIT COULD NOT BE DUPLICATED.
A DEALER SERVICE ENGINEER CALLED PROGENY ON (B) (6) 2009 REGARDING A COLLIMATOR, (B) (4), WHOSE LAMP CIRCUIT FAILED IN THE "ON" CONDITION CAUSING THE COVER TO BEGIN TO MELT. THE CUSTOMER ALLEGED THAT THE COLLIMATOR INTERNAL WIRING INSULATION CAUGHT FIRE AND CONTINUED TO BURN UNTIL THE WIRING CONNECTION FAILED WHICH STOPPED THE ELECTRIC CURRENT AND BURNING CEASED. NO INJURIES WERE REPORTED. THE UNIT WAS REPAIRED BY PROGENY TECHNICIAN ON 12/28/2009.
Devices
| Seq | Brand | Generic | Product Code | Manufacturer | Model | Lot | UDI-DI |
|---|---|---|---|---|---|---|---|
| 1 | EUREKA COLLIMATOR | IZW | MIDMARK CORPORATION | LINEAR II |
Patients
| Seq | Age | Sex | Outcome | Treatment |
|---|---|---|---|---|
| 1 |