HEATER-COOLER SYSTEM 3T
Report
- Report Number
- 9611109-2022-00014
- Event Type
- Malfunction
- Date Received
- January 11, 2022
- Date of Event
- November 1, 2021
- Report Date
- January 11, 2022
- Manufacturer
- LIVANOVA DEUTSCHLAND
- Product Code
- DWC
- UDI-DI
- 04033817901099
- Product Problem
- Yes
- Report Source
- Manufacturer report
- Reporter Location
- CH
- Reporter Occupation
- OTHER HEALTH CARE PROFESSIONAL
- Health Professional
- Yes
Narratives
THERE WAS NO PATIENT INVOLVEMENT. THE HEATER-COOLER 16-02-80 IS NOT DISTRIBUTED IN THE USA, BUT IT IS SIMILAR TO HEATER-COOLER 16-02-85, WHICH IS DISTRIBUTED IN THE USA (510(K) NUMBER: K191402). LIVANOVA (B)(4) MANUFACTURES THE HEATER-COOLER SYSTEM 3T. THE INCIDENT OCCURRED IN (B)(6). A LIVANOVA FIELD SERVICE REPRESENTATIVE WAS DISPATCHED TO THE FACILITY TO INVESTIGATE THE DEVICE AND COULD CONFIRM THE REPORTED ISSUE. THE FAILURE WAS TRACED BACK TO INSUFFICIENT REFRIGERANT INSIDE THE COMPRESSOR. THE REFRIGERANT WAS ADDED AND THE DEVICE RESUMED TO NORMAL FUNCTION. SUBSEQUENT FUNCTIONAL VERIFICATION TESTING WAS COMPLETED WITHOUT FURTHER ISSUES AND THE UNIT WAS RETURNED TO SERVICE. IF ANY ADDITIONAL INFORMATION PERTINENT TO THE REPORTED EVENT IS RECEIVED, IT WILL BE PROVIDED IN A SUPPLEMENTAL REPORT.
THERE WAS NO PATIENT INVOLVEMENT. THE HEATER-COOLER 16-02-80 IS NOT DISTRIBUTED IN THE USA, BUT IT IS SIMILAR TO HEATER-COOLER 16-02-85, WHICH IS DISTRIBUTED IN THE USA (510(K) NUMBER: K191402). LIVANOVA (B)(4) MANUFACTURES THE HEATER-COOLER SYSTEM 3T. THE INCIDENT OCCURRED IN (B)(6). A LIVANOVA FIELD SERVICE REPRESENTATIVE WAS DISPATCHED TO THE FACILITY TO INVESTIGATE THE DEVICE AND COULD CONFIRM THE REPORTED ISSUE. THE FAILURE WAS TRACED BACK TO INSUFFICIENT REFRIGERANT INSIDE THE COMPRESSOR. THE REFRIGERANT WAS ADDED AND THE DEVICE RESUMED TO NORMAL FUNCTION. SUBSEQUENT FUNCTIONAL VERIFICATION TESTING WAS COMPLETED WITHOUT FURTHER ISSUES AND THE UNIT WAS RETURNED TO SERVICE. IF ANY ADDITIONAL INFORMATION PERTINENT TO THE REPORTED EVENT IS RECEIVED, IT WILL BE PROVIDED IN A SUPPLEMENTAL REPORT.
LIVANOVA (B)(4) RECEIVED A REPORT THAT A HEATER-COOLER SYSTEM 3T AFTER RUNNING FOR ABOUT 20 MINUTES SHOWED COOLING SYSTEM NOT WORKING NORMALLY DURING A PROCEDURE. THE COOLING PROCESS WAS SLOW SO THE OPERATION COULD NOT BE CARRIED OUT SMOOTHLY, AND THE DEVICE WAS REPLACED WITH ANOTHER. THERE WAS NO REPORT OF PATIENT INJURY.
LIVANOVA (B)(4) RECEIVED A REPORT THAT A HEATER-COOLER SYSTEM 3T AFTER RUNNING FOR ABOUT 20 MINUTES SHOWED COOLING SYSTEM NOT WORKING NORMALLY DURING A PROCEDURE. THE COOLING PROCESS WAS SLOW SO THE OPERATION COULD NOT BE CARRIED OUT SMOOTHLY, AND THE DEVICE WAS REPLACED WITH ANOTHER. THERE WAS NO REPORT OF PATIENT INJURY.
Devices
| Seq | Brand | Generic | Product Code | Manufacturer | Model | Lot | UDI-DI |
|---|---|---|---|---|---|---|---|
| 754833 | HEATER-COOLER SYSTEM 3T | CONTROLLER, TEMPERATURE, CARDIOPULMONARY BYPASS | DWC | LIVANOVA DEUTSCHLAND | 16-02-80 | 04033817901099 |
Patients
| Seq | Age | Sex | Outcome | Treatment |
|---|---|---|---|---|
| 1 | Unknown |