PULSE GEN MODEL 101
Report
- Report Number
- 1644487-2008-01089
- Event Type
- Malfunction
- Date Received
- May 6, 2008
- Date of Event
- January 15, 2008
- Report Date
- April 30, 2008
- Manufacturer
- CYBERONICS, INC.
- Product Code
- LYJ
- PMA / PMN Number
- P970003
- Product Problem
- Yes
- Report Source
- Manufacturer report
- Reporter Location
- TX, US
- Reporter Occupation
- NOT APPLICABLE
Narratives
IT WAS REPORTED TO MANUFACTURER THAT THE VNS PT HAD THEIR GENERATOR REPLACED DUE TO END OF SERVICE. A BATTERY LIFE CALCULATION WAS PERFORMED AND WAS CALCULATED TO BE -2.60 YEARS UNTIL ERI (THE IMPLANT TIME EXCEED THE BATTERY LIFE ESTIMATE). THE GENERATOR WAS RETURNED TO MANUFACTURER FOR ANALYSIS. THE ANALYSIS FINDINGS SUPPORTED THE REPORTED END OF SERVICE CLAIM BASED ON BATTERY VOLTAGE MEASURING 1.878 VOLTS (DEPLETED). DURING TESTING, TRANSISTOR Q10 WAS FOUND TO EXHIBIT AN OUT-OF-LIMIT (HIGHER) LEAKAGE CURRENT AT TEST CHAMBER TEMPERATURE. THIS LEAKAGE INCREASED THE MODULE'S SUPPLY CURRENT 1MA CONSUMPTION BY APPROXIMATELY 5.137UA OVER THE HIGH LIMIT (SPEC 23.000 - 38.000MA) AND COULD POTENTIALLY BE A CONTRIBUTING FACTOR TO THE END OF SERVICE OF THE GENERATOR. HOWEVER, RESULTS OF THE BATTERY LONGEVITY PREDICTION CONFIRM THAT THE END OF SERVICE CONDITION WAS AN EXPECTED EVENT. WHEN THE Q10 COMPONENT WAS REPLACED, THE DEVICE WAS TESTED AGAIN, AND SUBSEQUENTLY MET MANUFACTURERS TEST SPECIFICATIONS.
Devices
| Seq | Brand | Generic | Product Code | Manufacturer | Model | Lot | UDI-DI |
|---|---|---|---|---|---|---|---|
| 1 | PULSE GEN MODEL 101 | LYJ | CYBERONICS, INC. | 101 | 1726 |
Patients
| Seq | Age | Sex | Outcome | Treatment |
|---|---|---|---|---|
| 1 |